ATF1224
06-29-2004, 09:30 PM
Thursday night at 9:00PM EST we will be holding a multiplayer session on the D&H Route by Maple Leaf Tracks. We will operate CTC style with a dispatcher governing train movements. We are looking for volunteers to be the dispatcher. PM me if you are interested.
We will be simulating MODERN operations for this run, so the power will be CP and NS units leading the trains only. We will also allow D&H 7309 and 7312, but they cannot lead because they do not have ditch lights.
Here is a list of the Available trains:
CP164 CP intermodal (SB) - CN_Bayview has taken this train.
CP165 CP intermodal (NB) (often contains mixed freight torward rear of train) Philadelphia to Montreal
CP168 NS intermodal (NB) - NS5237 has taken this train.
CP169 NS intermodal (Southbound) Albany, NY to Binghamton, NY
CP214 CP manifest (southbound) Montreal to Binghamton, NY
CP412 CP manifest (Southbound) Saratoga Springs, NY to Harrisburg
CP413 CP manifest (Northbound) Harrisburg to Saratoga Springs, NY
CP421 CP manifest (Northbound) Binghamton,NY to Toronto
CP422 CP manifest (southbound) Toronto to Binghamton,NY
CP993 CP Extra (NB) - ATF1224 has taken this train.
NS8858 NS loaded coal (NB) - CRSD40 has taken this train.
NS8859 NS empty coal (southbound) Mowhawk yard to Harrisburg, PA as required
NS8860 NS loaded coal (Northbound) Binghamton, NY to Mowhawk yard as required
NS8861 NS empty coal (southbound) Mowhawk yard to Binghamton, NY as required
The Teamspeak IP will be posted shortly.
Please reply here or at http://forums.flightsim.com/dcforum/DCForumID1/8731.html if you are interested in joining, with the following information:
Train Number:
Consist: (example: CP 5555, NS 6801, CP 2253)
Train Length:
Tonnage:
Restrictions: (Dimensional Loads, Hazmat, etc)
Work Enroute:
Starting Location:
Ending Location:
Time Joining:
**No duplicate engines will be allowed to lead**
We hope to have a good turnout for this one!
----- TRAINS AS OF 9:30PM 06/29/04 -----
TRAIN: CP 993
CONSIST: CP 9018, SP 7948, CP 5675
LENGTH: 3486 Feet
TONNAGE: 5353 Tons
RESTRICTIONS: **Dimnesional Load on rear of train**
WORK ENROUTE: Work at Delanson, Mohawk, CR S-Yard
STARTING LOCATION: Cobleskill (to Schnectady and back)
ENDING LOCATION: Cobleskill
TIME JOINING: 9:00 PM EST
TRAIN: CP 8858 (Bow coal loads)
CONSIST: NS 8820, BNSF 8000, BNSF 6902, BNSF 1104
LENGTH: 3658 Feet (including marker)
TONNAGE: 8946 Tons
RESTRICTIONS: None
WORK ENROUTE: None
STARTING LOCATION: Oneonta
ENDING LOCATION: Mechanicville Lead to the B&M
TIME JOINING: 9:00 PM EST
CP 164 - No Info Provided Yet
CP 168 - No Info Provided Yet
We will be simulating MODERN operations for this run, so the power will be CP and NS units leading the trains only. We will also allow D&H 7309 and 7312, but they cannot lead because they do not have ditch lights.
Here is a list of the Available trains:
CP164 CP intermodal (SB) - CN_Bayview has taken this train.
CP165 CP intermodal (NB) (often contains mixed freight torward rear of train) Philadelphia to Montreal
CP168 NS intermodal (NB) - NS5237 has taken this train.
CP169 NS intermodal (Southbound) Albany, NY to Binghamton, NY
CP214 CP manifest (southbound) Montreal to Binghamton, NY
CP412 CP manifest (Southbound) Saratoga Springs, NY to Harrisburg
CP413 CP manifest (Northbound) Harrisburg to Saratoga Springs, NY
CP421 CP manifest (Northbound) Binghamton,NY to Toronto
CP422 CP manifest (southbound) Toronto to Binghamton,NY
CP993 CP Extra (NB) - ATF1224 has taken this train.
NS8858 NS loaded coal (NB) - CRSD40 has taken this train.
NS8859 NS empty coal (southbound) Mowhawk yard to Harrisburg, PA as required
NS8860 NS loaded coal (Northbound) Binghamton, NY to Mowhawk yard as required
NS8861 NS empty coal (southbound) Mowhawk yard to Binghamton, NY as required
The Teamspeak IP will be posted shortly.
Please reply here or at http://forums.flightsim.com/dcforum/DCForumID1/8731.html if you are interested in joining, with the following information:
Train Number:
Consist: (example: CP 5555, NS 6801, CP 2253)
Train Length:
Tonnage:
Restrictions: (Dimensional Loads, Hazmat, etc)
Work Enroute:
Starting Location:
Ending Location:
Time Joining:
**No duplicate engines will be allowed to lead**
We hope to have a good turnout for this one!
----- TRAINS AS OF 9:30PM 06/29/04 -----
TRAIN: CP 993
CONSIST: CP 9018, SP 7948, CP 5675
LENGTH: 3486 Feet
TONNAGE: 5353 Tons
RESTRICTIONS: **Dimnesional Load on rear of train**
WORK ENROUTE: Work at Delanson, Mohawk, CR S-Yard
STARTING LOCATION: Cobleskill (to Schnectady and back)
ENDING LOCATION: Cobleskill
TIME JOINING: 9:00 PM EST
TRAIN: CP 8858 (Bow coal loads)
CONSIST: NS 8820, BNSF 8000, BNSF 6902, BNSF 1104
LENGTH: 3658 Feet (including marker)
TONNAGE: 8946 Tons
RESTRICTIONS: None
WORK ENROUTE: None
STARTING LOCATION: Oneonta
ENDING LOCATION: Mechanicville Lead to the B&M
TIME JOINING: 9:00 PM EST
CP 164 - No Info Provided Yet
CP 168 - No Info Provided Yet