MRRextreme
12-19-2001, 02:10 PM
Since we don't have Yard master yet. You could create a pseudo activity through a very long staging track. The trains would be placed on the staging track at about a half hour apart. The staging track would then feed into a mailine which leads to a yard.
Scenario 1: Start each consist at the beginning of a Driver session. Take control of a switcher in the yard and as the different consists arrive break the consists down and sort the cars into the classification tracks of the yard before the next one arrives.
Scenario 2 : The same set up could be used for any of the industries with goal being to sort the loaded cars and prepare the empties for the arriving consist.
You control the time at which the consists arrive by seperating the consist in distance on the staging track.
Scenario 1: Start each consist at the beginning of a Driver session. Take control of a switcher in the yard and as the different consists arrive break the consists down and sort the cars into the classification tracks of the yard before the next one arrives.
Scenario 2 : The same set up could be used for any of the industries with goal being to sort the loaded cars and prepare the empties for the arriving consist.
You control the time at which the consists arrive by seperating the consist in distance on the staging track.