fluteman70
07-26-2008, 01:02 PM
I am using an activity that is actually 3 activities in one. They follow each other in succesion. When I load the 1st two activities I get the errors: "FSoctEng.sms and FSwagT.sms" cannot be loaded. The activity then continues to load and run fine. The 3rd activity does not show the error signs and runs fine.
I have used RR every way I know to see if I can find the problem. I have checked the act. to see if I can find a referencd to either of the errors (as well as services and traffic).
I have checked the Scotsman to see if I can find any thing wrong and had no luck. Any suggestions will be appreciated.
Thanks,
Fred
I have used RR every way I know to see if I can find the problem. I have checked the act. to see if I can find a referencd to either of the errors (as well as services and traffic).
I have checked the Scotsman to see if I can find any thing wrong and had no luck. Any suggestions will be appreciated.
Thanks,
Fred